Real Deployments. Real Impact.

From National Retail Rollouts to Complex Enterprise Networks, See How ExcelLinx Delivers Measurable Value.

At ExcelLinx Communications, every completed project is more than a technical deployment; it’s a strategic solution built to support scale, security, and operational continuity. Our portfolio reflects the trust placed in us by enterprise clients, national retailers, and complex multi-site operations across Canada. From custom network integrations to nationwide rollouts, we bring technical precision and project accountability to every engagement.

Here are a few of our successfully completed projects:

FIFA World Cup Broadcast Infrastructure

Toronto ON & Vancouver BC, Summer 2026

In summer 2026, our team supported the technology infrastructure behind broadcast operations for FIFA World Cup matches played in Toronto and Vancouver. Working in the Technical Interface Room, our technicians made sure critical broadcast equipment and fiber connections stayed organized, powered, and operational throughout a time-sensitive, high-profile event.

Broadcast compound outside the stadium in Vancouver during the FIFA World Cup

Our scope of work included:

  • UPS Installation and Repositioning on the designated power rack, connected to assigned protected and domestic power sources
  • Vidi Broadcast Rack Support, including equipment status checks on the rack and its connected UPS units
  • Fiber Patching and Inspection, with jumpers checked for visible damage and every patch cable labelled at both ends
  • Cable Management, with power and fiber routed securely, excess lengths managed, and all cables kept off the floor
  • Rack and Equipment Case Positioning according to the required room layout
  • Visual and Operational Checks of the Vidi rack, UPS units, power connections, and fiber jumpers
  • Coordination with the Remote Network Operations Centre to verify system status and receive instructions
  • On-Site Shift Support, with technicians stationed in or near the Technical Interface Room
  • Photographic Quality-Control Documentation of the rack, UPS units, cable connections, and the complete room

Project Highlights:

  • Protected sensitive broadcast equipment against power interruptions and fluctuations with correctly powered, verified UPS units
  • Labelled every fiber patch cable at both ends for clear identification and faster troubleshooting
  • Maintained a clean, orderly technical space that reduced the risk of cables being disturbed during broadcasts
  • Provided immediate on-site assistance for the duration of each match (we worked on every match).
  • Delivered a complete photographic record of the finished installation to support ongoing system management

Live broadcasts leave no room for error, so every activity required close attention to detail, from equipment positioning and protected power connectivity to fiber patching, testing, and documentation. This project demonstrates our ability to deliver dependable broadcast technology infrastructure in a demanding, high-profile event environment.

HYATT PLACE

Windsor ON, September 2024

Design, planning and installation of low voltage cabling; data, voice, fiber optics; MDF-IDF designing; rack installations; CCTV cameras and sound system for a 6-storey hotel building in the heart of Windsor, ON.

This end-to-end solution ensures seamless connectivity, enhanced security, and a superior guest experience throughout the hotel. We’re thrilled to have contributed to the technological backbone of this modern hospitality space and to play a part in Windsor’s continued growth.

CAT6A 10-GIG NETWORK
& VOIP UPGRADE IN HISTORIC BUILDING

We were entrusted with the challenge of modernizing the network infrastructure of a building with over 100 years of history. The goal was to design and install a high-speed Cat6A 10-Gig cabling system and transition the client from an outdated analog phone setup to a fully integrated VoIP solution, without compromising the integrity of the building’s historic architecture.

Our team provided complete end-to-end services, including:

  • Design and Planning of the new cabling layout with respect to the building’s heritage structure
  • Installation of Cat6A 10-Gig Cabling System to support future-proof data speeds and performance
  • Upgrade from Analog to VoIP phone systems, improving call quality and system scalability
  • Coordination with building management to ensure minimal disruption and preservation of historical elements


Key Challenges:


  • Working within the constraints of a heritage property with limited access points
  • Avoiding damage to historical finishes and structural features
  • Maintaining full operational continuity during installation


The upgraded infrastructure now supports high-speed data transmission, improved communication reliability, and better system management. The transition to VoIP not only modernized the client’s phone system but also reduced long-term operational costs.

GLOBAL LOGISTICS COMPANY

Burnaby BC, August 2022

In September 2023, our team completed a comprehensive low-voltage infrastructure project for a commercial facility located in Burnaby, British Columbia. This project involved the full design, planning, and installation of critical network and communication systems to support current and future operational needs.

We delivered a turnkey solution that included:

  • Structured Low Voltage Cabling for data and voice networks
  • Fiber Optic Backbone Installation
  • MDF/IDF Room Design and Full Build-Outs
  • Network Rack Assembly and Installation
  • End-to-end Project Planning and Coordination

Project Highlights:

  • Designed and implemented a scalable network infrastructure with room for future growth
  • Installed high-performance fiber optics to support fast and reliable data transmission
  • Delivered organized and efficient MDF/IDF layouts for simplified maintenance and expansion
  • Completed the project on time and within budget, with minimal disruption to ongoing operations

The newly installed network infrastructure provides enhanced connectivity, improved reliability, and long-term flexibility for the client’s growing needs. Our team ensured that every component was installed to industry standards, setting the foundation for a robust IT environment.

COMPLETE WIRELESS DEPLOYMENT SENIOR RESIDENCE

Toronto ON, March 2021

In this special project, our team delivered a complete wireless infrastructure solution for a long-term living facility. Beyond just technical installation, we provided personalized support to ensure that residents could easily access and navigate the new wireless system, bridging the gap between technology and comfort.

Our end-to-end solution included:

  • On-Site Wireless Survey to assess coverage and interference areas
  • Network Design & Planning tailored to the facility’s unique layout and user needs
  • Structured Data Cabling and EMT installation for all wireless access points
  • Wireless Access Point Mounting for optimal coverage and accessibility
  • MDF/IDF Build-Outs with organized racks and cable management
  • Full System Configuration, including secure network segmentation for staff and residents
  • Resident Account Setup & Device Support
  • Wireless Training for Seniors, covering how to connect personal devices, access the internet, and stay secure online


Project Highlights:

  • Created a safe, stable, and easy-to-use wireless network for residents and staff
  • Delivered one-on-one support for seniors, ensuring they felt confident using their devices
  • Provided staff with tools and training to help maintain and support the system internally

The upgraded wireless network has significantly improved the quality of life for residents, enabling better communication with family, access to online services, and enhanced recreational opportunities. Staff members now benefit from reliable connectivity for operational tasks, and the facility is future-ready for additional smart care technologies.

HYATT PLACE

Brampton ON, August 2022

Our team successfully completed the full design and implementation of low-voltage systems for a newly developed commercial building located in Brampton, Ontario. The project involved delivering a seamless and scalable infrastructure tailored to support the building’s technological and operational needs.

We provided a complete turnkey solution that included:

  • Structured Low Voltage Cabling
  • Data and Voice Network Installation
  • Fiber Optic Backbone Deployment
  • MDF and IDF Room Design & Rack Installation
  • CCTV Surveillance System
  • Integrated Audio System for Common Areas

By leveraging industry best practices and high-quality materials, we ensured a reliable and future-proof infrastructure. The result is a robust and secure network that enhances the functionality, safety, and communication capabilities throughout the facility. 

This project highlights our commitment to delivering reliable, high-performance solutions that support the operational and guest service needs of modern hospitality spaces.

Explore Our Project Highlights To See How Excellinx Delivers Real-world Results. Ready To Scope Your Next Deployment?

Contact Us To Start A Conversation With Our Integration Specialists.